NORMO · How it works
ABCDEFGHIJKL
How it works

From your project to a working system.

Tell us what you need. Together we define the configuration, establish installation requirements and organise commissioning.

Talk to the team

A project, six stages.

From the first conversation to the first delivery. Each stage makes the next decision clear.

  1. Contact

    Tell us about your project.

    Building type, location, available space and timing. Our commercial team uses this information to start defining the system you need.

    Use and capacity
    Space and location
    Project timing
  2. Configuration

    Choose the system. Define the composition.

    We assess capacity and installation requirements to choose Display or Lock. Either can be combined with postal mailboxes; Display also supports electronic postal mailboxes.

    Normo Display integrated beside a hotel reception.

    Normo Display

    Touchscreen and network connection. Also compatible with electronic postal mailboxes.

    Normo Lock with individual locks integrated into a lobby.

    Normo Lock

    Battery-powered locks, keypad and app. No power or network cabling at the locker.

    Either technology can be combined with postal mailboxes.

  3. Proposal

    A clear scope before you decide.

    Review the configuration and quotation. Once you confirm, we collect the details needed to prepare your order and service agreement.

    Configuration
    Installation scope
    Digital service
  4. Preparation

    A place for the system.

    A new development and an existing building need different preparation. We establish the mounting location, delivery address, receiving contact and connections required by your chosen system.

    New development

    Coordinate space, mounting and connections with the project and construction team.

    Existing building

    Review the mounting location and preparation required by the chosen configuration.

  5. Manufacturing

    From the agreed design to delivery.

    The approved configuration goes into manufacturing. We coordinate supply using the project drawing and delivery details.

    See how we manufacture
    Finished and packaged NORMO lockers in the production facility.
  6. Commissioning

    Ready to start using it.

    Delivery includes assembly, checks, registration, training and documentation, so the people managing and using the system know how to get started.

    Assembly
    Checks
    Registration
    Training
    Documentation

The service continues.

Installation is followed by ongoing use. The digital service includes notifications, updates and remote support. Additional connectivity and optional maintenance are specified separately in the proposal.

What happens with each parcel?

Explore delivery and collection, and the differences between Display and Lock.

Explore the system

Before getting started.

What information do you need to get started?

The building type, location, available space, number of homes or users and project timing. Plans or photos of the proposed location help us define the configuration.

Can Display and Lock be combined?

You choose Display or Lock. Both can be combined with postal mailboxes, and Display also supports electronic postal mailboxes.

What does installation require?

Display needs power and a network connection. Lock uses battery-powered locks and does not need power or network cabling at the locker. Mounting requirements depend on the chosen configuration and location.

What is included in delivery?

Assembly, checks, registration, training and documentation. The proposal specifies the scope of the project.

What service continues after installation?

The digital service includes notifications, updates and remote support. Additional connectivity and optional maintenance have their own conditions, detailed in the proposal.

Do users need an app?

Display recipients collect using a QR or code on the screen, without an app. Lock recipients need the NORMO app and Bluetooth. Registration is part of preparing the system for use.

How long does the project take?

Timing depends on the configuration, manufacturing and readiness of the installation site. We establish the schedule for your project when defining the proposal.

Tell us about your project.

Building type, location and timing. With this information, we can start defining the system with you.

Talk to the team